Designed a 1,000-ton metal silo for ash storage
Our services have consisted of the engineering of a metal silo for a storage of 1,000 tons of ash (2,000 m3), including detailed engineering of the civil area and the structural and silo areas for Kemex-Ingesoa company. In order to carry out our services, Ingenova has carried out the calculation and drawings of […]
Metal structure in alternate fuels installation in Colombia
Metal structure in alternate fuels installation in Colombia Developed in: Colombia Date: 2023 Ingenova has carried out the engineering of the metal structures of an alternate fuels installation located in Sonsón, Department of Antioquía in Colombia. The new installation includes: a 70m² dosing tower with 4 floors, which houses a dosing hopper, two augers, a dosing […]
Metal silo of 1,000 tons for storage of ashes
Metal silo of 1,000 tons for storage of ashes Developed in: MoroccoDate: 2023 Engineering of a metal silo for storage of 1,000 tons of ash (2,000 m3), including detailed engineering of the civil area and the structural and silo area. In order to carry out our services, Ingenova has carried out the calculation and plans […]
Ingenova, new member of ARPHO
Ingenova joins the ARPHO Association for concrete repair, reinforcement and protection as a new member to broaden its knowledge in the sector and improve the service provided, pursuing one of its main values, which is maximum customer satisfaction. ARPHO was born in 2010 with the aim of bringing together the group of companies […]
Ingenova develops the civil engineering for a geothermal pilot plant project in Bolivia.
Ingenova has developed the detailed civil engineering for the construction of the Laguna Colorada geothermal pilot plant in Potosí (Bolivia) carried out by SACYR. The pilot plant is located in the Sol de Mañana geothermal field, 290 km from Uyuni – Potosí – Bolivia, it is a pioneer project in South America and […]
Two cement grinding lines in Ghana, 120 T/h.
Two cement grinding lines in Ghana, 120 t/h. Developed in: Ghana Date: 2015-2022 Basic and detail civil engineering including the fabrication drawings for the entire plant and the following buildings: reception, transport and storage of raw materials, cement grinding including mill, cement transport to cement silos, cement silos, cement transport to the bagging […]
Structural audit of a cement factory in Alicante
Structural audit of a cement factory in Alicante Developed in: SpainDate: 2023 Visual inspection campaign and collection of available information on the metal and concrete structures of a cement factory ir order to assess the state of conservation detect and catalog structural pathologies that required repair in factory maintenance work. The action plan was based […]
Cement dosing plant (Peru). Inka project
Cement dosing plant (Peru). Inka project Developed in: Peru Date: 2021-2022 Basic and detail engineering of the civil and steel structures engineering of a grinding plant in Peru including a building and hoppers for raw material, elevator tower, concrete dip and building foundations. Our intervention has been consolidated in the mill plant that it is […]
Structural audit of a cement factory in Spain
A visual inspections campaign and collection of available information about the metal and concrete structures of a cement factory has been carried out in order to assess the state of conservation, detect and catalogue structural pathologies that require repair in the factory maintenance works. The action plan is based on the following line […]
Project for a cement grinding plant in Guatemala
In this new project we are carrying out detailed civil and structural engineering for a cement grinding plant developed in Guatemala. The grinding plant includes: a building with a metallic structure measuring 25 meters by 15 meters in surface area and 30 meters high with a main floor for the primary filters, a second floor […]