Date: 06-2024
In 2022, Ingenova developed the engineering of the second grinding line (Ghanex project) for its cliente CEMTEC in Tema (Ghana).
The assembly of the line is completed and the clinker silo is currently being built. The foundation consists of piles drilled and concreted in situ, connected by a circular slab that also acts as the bottom of the silo.
To learn more about our client CEMTEC visit:
https://www.linkedin.com/company/cemtec—cement-and-mining-technology/