Date: 11-2022
In this new project we are carrying out detailed civil and structural engineering for a cement grinding plant developed in Guatemala.
The grinding plant includes: a building with a metallic structure measuring 25 meters by 15 meters in surface area and 30 meters high with a main floor for the primary filters, a second floor for the process equipment and the building enclosure and finally , the foundation of the mill building, fan and chimney of the main filter.
Additionally, Ingenova will also carry out the detailed engineering of the enclosure for this building.