Two cement grinding lines in Ghana, 120 t/h.

Developed in: Ghana

Date: 2015-2022

 

 

Basic and detail civil engineering including the fabrication drawings for the entire plant and the following buildings: reception, transport and storage of raw materials, cement grinding including mill, cement transport to cement silos, cement silos, cement transport to the bagging building, bagging building and electrical room.

 

Our company developed the first phase of this cement grinding plant in 2016 and has recently been involved in the second line which includes a clinker silo, a grinding unit, cement silos and connections to the existing line.

 

 

Image gallery

Solverwp- WordPress Theme and Plugin