Date: 07-2024
Ingenova is developing the engineering of the new installation of two additions silos at CEMEX’s factory in Castillejo (Toledo).
This engineering consists of:
- the implementation, mechanical and civil engineering of two 1000Tn metal silos including their support structure, maintenance platforms, foundation and a light platform on them for the filling conveyor
- the mechanical and civil engineering of the transport of filling the silos, including the installation of a new elevator and the metal structures necessary to support the elevator, walkways for the new aerials and access stairs to intermediate floors and the roof of the silo
- the basic implementation of pneumatic transport from the silos to cement mills 6 and 7.